Question

Which of the following indicates the assumption assumed in case of curvature correction?

a.

End sections are parallel

b.

End sections are vertical

c.

End sections are not present

d.

End sections are perpendicular

Posted under Surveying

Answer: (a).End sections are parallel

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Which of the following indicates the assumption assumed in case of curvature correction?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Which of the following is not a case assumed in curvature correction?

Q. Level section requires application of correction.

Q. For larger and smaller areas, same formula can be applied in case of side-hill section.

Q. Correction for curvature is applied for getting ___________

Q. What is the correction applied for two-level section if the area of the traverse is 121.45 sq. m and value of e = 9.34?

Q. What will be the correction for curvature of three level sections, if the areas are given as 43.56 sq. m, 22.54sq.m and h = 56.43 sq. m, b= 2, n= 2 which are having faces at a unity distance having 59.87 m radius?

Q. Find the value of eccentricity if the values of area of the sides can be given as 134.76 sq. m, 56.76 sq. m and A = 76.65 sq. m with number of sides as 2.

Q. Find the correction for side hill of two level section if the area is given as 654.76 sq. m, and the value of eccentricity is 89.76.

Q. Find the value of e for side hill of small area by using the values provided. W = 54.32 sq. m, b = 1, n = 2, h = 76.24 sq. m.

Q. Which principle is used in the process of permanent adjustment of dumpy level?

Q. Which of the following does not indicate a principle line?

Q. Which of the following does not represent the condition of adjustment?

Q. The principle of single reversion is involved in which of the following processes?

Q. Which of the following processes is adopted when speed of the work is concerned?

Q. Which adjustment doesn’t need any levelling?

Q. The adjustment of line of collimation is having most priority in permanent adjustments.

Q. Dumpy level is used for_________

Q. Permanent adjustments are done at every time the instrument is setup.

Q. Determine the inclination of line of sight if H = 2.654 m and Hꞌ = 1.876 m and the distance between the points can be given as 150 m.

Q. Find the amount of inclination provided in case of two stations A and B having staff readings 0.984m, 0.765m which are placed at a distance of 100m.

Recommended Subjects

Are you eager to expand your knowledge beyond Surveying? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!