Question

A proper assessment should be made before sewers are sized or treatment plant capacities are set.

a.

True

b.

False

c.

May be True or False

d.

Can't say

Answer: (a).True

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. A proper assessment should be made before sewers are sized or treatment plant capacities are set.

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. What is the lowest wastewater flow in hospitals?

Q. __________ in residential areas resemble water usage patterns in those areas.

Q. A graph showing discharge versus time past a specific point in a conduit carrying flow is called?

Q. The maximum velocity in a channel section often occurs _______ the water surface.

Q. What is the maximum velocity of tap water such that the flow causes low noise?

Q. Which of these equations is used to calculate the water velocity inside of a pipe?

Q. What is the minimum velocity required in sewers to keep the foreign particles from settling?

Q. Exceeding 10 ft/sec may increase the likelihood of hydraulic surges.

Q. What is the maximum allowable velocity in public water mains?

Q. The increasing flow velocity in water systems not only creates noise but also leads to the wear and tear of the pipes.

Q. Storm water is collected from streets into the __________ which in turn discharged into main drains of open type.

Q. The depth in open drain should preferably be kept _______ the man height.

Q. Which of the following is considered if sewers are placed on the softer grounds?

Q. In India which type of sewer systems are preferred?

Q. Partial sewers carry a part of stormwater to sanitary sewers.

Q. Two sets of sewers are laid in _________ system.

Q. Which of the following is an advantage of separate sewers?

Q. When only one set of sewers are used to carry both sanitary sewage and storm water, it is called as __________ system.

Q. If sizes of the sewers are __________ choking problems are less.

Q. Which of the following is a disadvantage with respect to the size of the sewers?

Recommended Subjects

Are you eager to expand your knowledge beyond Waste Water Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!