Question

In partial systems, there is no over load on the treatment plants.

a.

True

b.

False

c.

May be True or False

d.

Can't say

Answer: (b).False

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. In partial systems, there is no over load on the treatment plants.

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The treatment is costly in which of the following systems?

Q. The process that involves connecting pipelines and sewer appurtenances to transport waste to sewage treatment centres is called?

Q. Pipeline networks are designed by engineers and installed by sewer contractors in accordance with federal and state regulations.

Q. Sewer systems can also be referred as _________

Q. On which of the factors mentioned below, the type of the sewer installed does not depend on?

Q. __________ is required to transport storm water runoff from roofs, parking lots, streets, and highways to a point of discharge.

Q. Combined sewer systems are no longer installed due to the water pollution problems they present.

Q. Which of the following factors mentioned below marks essential for planning sewer systems for a community?

Q. The abbreviation of SUE is?

Q. Which of these is the most common pipeline installation method?

Q. The type of wastewater treatment process for treating wastewater or industrial wastewater using aeration and biological flocs is called?

Q. What is the abbreviation of SSMP?

Q. For which of the following reason SSMP is not used?

Q. SSMPs are used to minimize the number and impact of sanitary sewer overflows that occur.

Q. The legal entity that is responsible for the wastewater collection system is called ___________

Q. SORP stands for?

Q. What are the structures that are constructed at suitable intervals along the sewerage system called?

Q. A masonry or R.C.C. chamber constructed at suitable intervals along the sewer lines, for providing access into them is called _________

Q. What is the spacing of manholes for pipe diameter of greater than 2 m?

Q. What are the manholes having a depth greater than 1.5 m called?

Recommended Subjects

Are you eager to expand your knowledge beyond Waste Water Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!