Question
a.
Engineering
b.
Traffic
c.
Financial
d.
Soil
Posted under Highway Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. The topographic survey is conducted to estimate which of the following characteristics?
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The master plan may not be prepared for ______________
View solution
Q. The determination of optimum length is based on ______________
View solution
Q. The final step after fixing the optimum length of the road is?
View solution
Q. The utility unit as per saturation system for a population of less 1001 to 2000 is?
View solution
Q. As per the Nagpur plan, the un-surfaced roads were meant for _____________
View solution
Q. The total length of the first category roads was calculated by adding up the sum of __________
View solution
Q. What was the development allowance assumed in the Nagpur plan?
View solution
Q. During the development of the roads maximum priority is given to which type of road?
View solution
Q. The total length of highways in 2001 in km was __________
View solution
Q. The total area of a state is 2500 km. Calculate the length of MDR.
View solution
Q. The tertiary road system consists of __________
View solution
Q. The ‘rural road development plan: Vision 2025’ aims to provide basic access to villages in how many phases?
View solution
Q. Expressways should be constructed along __________
View solution
Q. The maximum number of cities and towns are connected by which type of highway?
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Highway Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!