Question
a.
Project report
b.
Project feasibility
c.
Estimate
d.
Detailed project report
Posted under Highway Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. The approximate cost of construction evaluated for the project is called __________
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as __________
View solution
Q. The planning, design and construction of either a network of new roads or road link is called __________
View solution
Q. Highway should be planned for __________
View solution
Q. The New highway project is divided into how many stages?
View solution
Q. A part of land that is acquired during the initial stages of construction for future expansion is called ____________
View solution
Q. Which method is recommended by IRC for flexible pavements?
View solution
Q. Inspection of the site is done in which survey?
View solution
Q. Road roughness is tested by ___________
View solution
Q. To minimize the cost of the project the most suitable method is ___________
View solution
Q. The highly flooded areas should be re aligned by ___________
View solution
Q. Embankments are provided on a highway near ___________
View solution
Q. The drawing for re alignment shows the existing road, proposed re alignment, contours and all other features it is called as ___________
View solution
Q. The DPR consists of how many components?
View solution
Q. The first step in the detail checklist of DPR is ___________
View solution
Q. The name of the work and project details is managed under which category of DPR?
View solution
Q. The roadway features include the study of ___________
View solution
Q. The final step in the specifications and design of roadway elements is ___________
View solution
Q. Which of the following is not a structure constructed for drainage purposes?
View solution
Q. The strength of the materials can be checked by ___________
View solution
Q. For small projects which type of method is used for the calculation of project time?
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Highway Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!