Question

The liquid limit of soil for embankment construction is __________

a.

Less than 70%

b.

Less than 90%

c.

Less than 60%

d.

Less than 45%

Posted under Highway Engineering

Answer: (a).Less than 70%

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The liquid limit of soil for embankment construction is __________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The free swelling index of soil should be less than __________

Q. The plasticity index for a sub grade should be less than __________

Q. The rollers that uses both tamping and kneading is __________

Q. The removal of earth for highway formation is __________

Q. The best time to remove soil is during __________

Q. What is the equipment used for short haul distance of 100 m?

Q. The blade angle of bulldozer is usually __________

Q. The precise control of excavation is possible by __________

Q. The boom is supported by __________

Q. Dragline cannot excavate __________

Q. The stiff materials can be excavated by __________

Q. The equipment having a bucket is?

Q. The compaction of sand is done by __________

Q. The loss with sodium sulphate cycles for aggregate used for bitumen is __________

Q. How many kg of binder is applied for 10m² area?

Q. Built up spray grout consists of __________

Q. The stripping of aggregate should be less than __________

Q. The camber is checked at every interval of __________

Q. What is the minimum thickness used in bituminous macadam?

Q. The interface bond between the existing pavement and new pavement is provided by __________

Recommended Subjects

Are you eager to expand your knowledge beyond Highway Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!