Question
a.
45 mm
b.
55 mm
c.
65 mm
d.
75 mm
Posted under Highway Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. The depth of the hole dug for measuring of temperature is ___________
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The quantity of soil collected in benkleman beam method is ___________
View solution
Q. The deflection value D is obtained from multiplying the difference of initial and final gauge difference of ___________
View solution
Q. The difference between initial and final deflection should not exceed ____ mm, for no leg correction value.
View solution
Q. The statistical analysis of data doesn’t require ___________
View solution
Q. The characteristics deflection value is ___________
View solution
Q. The sum of 15 deflections is 100, find the mean deflection.
View solution
Q. The deflection correction will be negative if the temperature exceeds ___________
View solution
Q. The Overlay thickness depends on how many factors?
View solution
Q. The VDF is assumed as 4.5 for commercial vehicle count of ___________
View solution
Q. The thickness of the flexible overlay is given by ___________
View solution
Q. The spacing between longitudinal joints may be ___________
View solution
Q. The pavement design in olden days was based on ___________
View solution
Q. The thickness of the pavement in olden days was ___________
View solution
Q. The cement production in India increased by the year.
View solution
Q. The common types of failure in the cement slabs don’t include ___________
View solution
Q. The design thickness of the CC slab of important highway with heavy traffic is?
View solution
Q. The process of mud or soil being ejected out through the joints and edges of the CC pavements is called ___________
View solution
Q. The factor which doesn’t initiate mud is?
View solution
Q. The diameter of the holes in the mud jacking process is?
View solution
Q. If a part of cement mortar gets detached from the surface, exposing the coarse aggregate which results in a rough surface, then it is called ___________
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Highway Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!