What is the amount of water required to give the paste normal consistency for consistency test?

a.

0.78 times

b.

0.79 times

c.

0.77 times

d.

0.76 times

Posted under Concrete Technology

Answer: (a).0.78 times

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. What is the amount of water required to give the paste normal consistency for consistency test?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Which apparatus is generally used to measure the soundness of the cement?

Q. Why do we need Standard Consistency Test?

Q. What is standard consistency?

Q. When the cement paste is tested within the gauging time. Here what is the value of gauging time?

Q. How many moulds required for the compression strength test of cement?

Q. Which of the following option is correct?

Q. Standard consistency of cement is tested by ___________

Q. Calculate standard consistency(%) when 100 ml of water is added in 1000 g of cement.

Q. For making cement paste, what is the amount of water we need?

Q. What is the normal consistency for OPC?

Q. The relative humidity of laboratory should be ___________ for standard consistency.

Q. In cement hardening process ___________ instants are very important.

Q. What is the initial setting time?

Q. Initial setting time of OPC should not be less than ___________

Q. Final setting time of cement should not be more than _______

Q. In the soundness test, the whole assembly is immersed in water for _______

Q. What is the final setting time?

Q. Initial setting time of Low Heat Cement should not be less than _____________

Q. If t1=Time at which water is first added to cement, t2=Time when needle fails to penetrate 5 mm to 7 mm from bottom of the mould, t3=Time when the needle makes an impression but the attachment fails to do so, then what is initial setting time?

Q. If t1=Time at which water is first added to cement, t2=Time when needle fails to penetrate 5 mm to 7 mm from bottom of the mould, t3=Time when the needle makes an impression but the attachment fails to do so, then what is final setting time?