Question
a.
100 m
b.
150 m
c.
200 m
d.
300 m
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Ventilating shafts are provided to a sewer line at every
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Which one of the following part of human body withstands minimum radiation
View solution
Q. The water carried sewerage system removes
View solution
Q. Stoneware sewers are available in size
View solution
Q. The sludge does not contain waste water from
View solution
Q. Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for
View solution
Q. 5 days-biochemical oxygen demand (BODâ‚…) is taken at a temperature of
View solution
Q. Water content of sewage is about
View solution
Q. Imhoff cone is used to measure
View solution
Q. For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is
View solution
Q. If the peak discharge of a storm water drain (S.W. Drain) is e.xpected to exceed 150 cumecs, the free board to be provided, is
View solution
Q. PH value of sludge during alkaline regression stage, is
View solution
Q. Depletion of ozone layer in the outer atmosphere may cause
View solution
Q. The spacing of bars of perforations of fine screens used for the treatment of sewage, is
View solution
Q. The self-cleansing velocity of water flowing through pipe lines, is
View solution
Q. The pH value of fresh sewage is usually
View solution
Q. The moisture content of a sludge is reduced from 90% to 80% in a sludge digestion tank. The percentage decrease in the volume of sludge, is
View solution
Q. Inter-distance between ventilation columns in a sewer line is kept
View solution
Q. The factor responsible for purification of sewage in river is
View solution
Q. 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the DO. concentration was 5 mg/l. The BOD of raw sewerage is
View solution
Q. The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!