Question
a.
Lateral reinforcement in R.C.C. columns is provided to prevent the longitudinal reinforcement from buckling
b.
Lateral reinforcement prevents the shearing of concrete on diagonal plane
c.
Lateral reinforcement stops breaking away of concrete cover, due to buckling
d.
All the above.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Pick up the correct statement from the following:
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The allowable tensile stress in mild steel stirrups, reinforced cement concrete, is
View solution
Q. If longitudinally spanning stairs are casted along with their landings, the maximum bending moment per metre width, is taken as
View solution
Q. If A is the sectional area of a prestressed rectangular beam provided with a tendon prestressed by a force P through its centroidal longitudinal axis, the compressive stress in concrete, is
View solution
Q. According to I.S.: 456, 1978 the thickness of reinforced concrete footing on piles at its edges, is kept less than
View solution
Q. A pre-stressed concrete member is preferred because
View solution
Q. A very comfortable type of stairs is
View solution
Q. For M 150 grade concrete (1:2:4) the moment of resistance factor is
View solution
Q. For a ribbed slab
View solution
Q. The maximum ratio of span to depth of a slab simply supported and spanning in two directions, is
View solution
Q. The neutral axis of a T-beam exists
View solution
Q. The self-weight of the footing, is
View solution
Q. For normal cases, stiffness of a simply supported beam is satisfied if the ratio of its span to its overall depth does not exceed
View solution
Q. If the length of an intermediate span of a continuous slab is 5m, the length of the end span is kept
View solution
Q. The floor slab of a building is supported on reinforced cement floor beams. The ratio of the end and intermediate spans is kept
View solution
Q. For a continuous floor slab supported on beams, the ratio of end span length and intermediate span length, is
View solution
Q. Steel bars are generally connected together to get greater length than the standard length by providing
View solution
Q. By over-reinforcing a beam, the moment of resistance can be increased not more than
View solution
Q. In a cantilever retaining wall without a heel slab
View solution
Q. The design of heel slab of a retaining wall, is based on the maximum bending moment due to:
View solution
Q. A per IS : 1343, total shrinkage for a pretensioned beam, is
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!