Question
a.
rains
b.
rivers
c.
lakes
d.
springs.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Underground water is obtained from
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Pick up the correct statement from the following :
View solution
Q. Pressure relief valves are provided in water mains
View solution
Q. Pick up the incorrect statement from the following :
View solution
Q. The percentage of chlorine in fresh bleaching powder is roughly
View solution
Q. Higher yield may be expected from
View solution
Q. Pick up the correct statement from the following :
View solution
Q. The valve fitted closely in a recess against an opening in a pipe, is generally
View solution
Q. For calculation of economical diameter D of a pipe in metres for a discharge Q to be pumped in cumecs, Lea suggested the empirical formula
View solution
Q. Raw water treated with only chlorine, is known as
View solution
Q. The level of underground water is called
View solution
Q. Per capita demand of water is calculated in litres
View solution
Q. P.V.C. pipes can withstand pressure bead of water upto
View solution
Q. The population of a city in 2000 is 50,000. The average increase in population over last 8 decades is 7500 and average incremental increase during 8 decades is 750. The population of the city based on incremental method, in the year 2020 will be
View solution
Q. A pressure conduit carrying water beneath a stream or a canal, is known as
View solution
Q. Suction lift of a pump depends upon
View solution
Q. For 3.25 x 10^-2 cumecs discharging from a well, a pump is installed to lift water against a total head of 30 m. The minimum required horse power, is
View solution
Q. Capacity of soil to absorb moisture, is generally known as
View solution
Q. At break point of chlorination,
View solution
Q. The difference in the reservoir level and the lowest point of the water mains is 180 m. The expected pressure due to water hammer is 7.5 kg/cm² in a pressure conduit of diameter 1 m. Assuming the efficiency of the riveted joints of the pipe as 0.6 and minimum cover 3 mm for corrosion, the thickness of the pipe materials, is
View solution
Q. The factor for the selection of pumping station site, is
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!