Which method is adopted to develop an approximate or conceptual estimate for perimeter works for buildings from the following:

a.

Base unit method

b.

Cost per function method

c.

Cost per square metre method

d.

Cost per linear metre method

Posted under Civil Engineering

Answer: (d).Cost per linear metre method