Question

The higher level of production leads to

a.

higher repair cost

b.

higher setup cost

c.

lower repair cost

d.

higher setup cost

Posted under Cost Accounting

Answer: (a).higher repair cost

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The higher level of production leads to

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The method of estimation of cost function, by making the opinions and analysis about cost and cost drivers is classified as

Q. Within the relevant range, the cost function in which cost does not change in narrow ranges of activity is called

Q. In the linear cost function which is y=a + bx, the objective is to find the

Q. The statistical method used to measure average change in dependent variable, with respect to change of one unit in independent variable is called

Q. The line which uses to join observations with lower and highest values of cost driver is called

Q. A technique which minimizes sum of squared vertical difference, to determine the regression line is considered as

Q. In Regression Analysis, if an observed cost value is 85 and the disturbance error is 25 then predicted cost value will be

Q. The better fit between estimated cost and actual observations is represented by

Q. If an unexplained variation is 456870 and the total variation is 955000, then the coefficient of determination will be

Q. In Regression Analysis, the testing of assumptions if these are true or not is classified as

Q. In estimation of cost functions, the variations in a single activity level represents the

Q. An estimated coefficient, which indicates the degree by which the estimated values are affected by random factors is known as

Q. The Regression Analysis Method of quantitative analysis of cost function considers

Q. If the difference between costs linked to highest and lowest observation of cost driver is $36000 and observation of cost driver is 30 machine hours, then slope coefficient would be

Q. In quantitative analysis of estimating cost function, the last and foremost step is to

Q. The work measurement method of cost estimation is also called

Q. The function which is used to measure the decline in per unit cost of different business functions is classified as

Q. The worse fit between estimated cost and actual observations is shown on regression line with

Q. The slope coefficient of linear cost function is

Q. The learning curve models include

Recommended Subjects

Are you eager to expand your knowledge beyond Cost Accounting? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!