Question

Which type of structure does the diagram represent?

a.

Borrow Pit

b.

Freeboard

c.

Spoil Banks

d.

Berm

Posted under Irrigation Engineering

Answer: (a).Borrow Pit

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Which type of structure does the diagram represent?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. What structure does the diagram represent?

Q. What are the types of sediment load?

Q. Increased dissolved load gives the flooded stream its muddy color.

Q. At low velocity, the bed does not move at all but as velocity increases, it goes on assuming different shapes.

Q. On increasing velocity beyond the threshold stage of motion, the bed develops ____________ shape.

Q. Which of the following statement is wrong?

Q. When the velocity is further increased beyond the stage where sand waves are formed in association with the surface waves, the waves are then called as ____________

Q. In the case of canals and natural streams, anti-dunes rarely occur.

Q. On which factor does the movement of bedload depends?

Q. Commonly the bed load is 10% of total suspended load.

Q. What type of force is completely responsible for the bedload movement?

Q. Which type of force is needed for suspension of suspended load in flowing water?

Q. A part of tractive force does not have any part in transporting the bed material, i. e bed load.

Q. Given that the bed slope of a channel is 1 in 2000 and the discharge is 60 cumecs. The depth of the channel is fixed and is given as 2 m. The tractive force needed for the movement of bedload is? Take critical velocity ratio as 1.1.

Q. What cause is prime responsible for the heavy movement of water from main canal to branch canal?

Q. Water in which condition or state carry a maximum amount of sediment?

Q. What minimum value of shear stress is needed to move the sediment?

Q. Design a channel carrying a 30 cumecs. The median grain diameter is taken as 0.5 mm. The bedload concentration is 60 p.p.m by weight. Use Lacey’s Regime perimeter and Meyer-peter’s formulas.

Q. The scouring and silting on the river banks raise the flood levels for the particular discharge.

Q. The phenomenon of sediment transport increases maintenance work and sometimes leads to huge economic loss.

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!