Question

By constructing which structure we can help the fish in their migration?

a.

Scouring Sluices

b.

Silt Excluder

c.

Fish Ladder

d.

Divide Wall

Posted under Irrigation Engineering

Answer: (c).Fish Ladder

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. By constructing which structure we can help the fish in their migration?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. What device is placed in front of head regulator for silt removal?

Q. Which device is used for silt removal after it enters the canal?

Q. Depending on how many considerations the capacity of under sluices is fixed?

Q. How many river training works are needed on the canal head works?

Q. When the depth is small, the name for the jump?

Q. When the change in depth is large, then the jump is said to be direct jump.

Q. For what limits of Froude number, the jump is said to be weak jump?

Q. For the value of Froude number 9 the jump is said to be strong jump.

Q. How many assumptions are made for the derivation of momentum formula?

Q. Depending upon the Froude number, into how many groups the jumps are classified?

Q. On which surface the energy dissipation is less efficient?

Q. The length of the jump is how times the height of the jump?

Q. In what limits the slopes of the glacis are provided?

Q. For what value of Froude number the jump is steady jump?

Q. What are the two main causes of failure of hydraulic structure on the pervious foundation?

Q. The uplift pressure is not important for the upstream apron during considerations of failure due to uplift.

Q. The structure finally subsides in the hollow formed in the foundation in which failure?

Q. Heave piping may occur on the _______________

Q. Backward erosion piping takes place when the phreatic line cuts the downstream face of the dam and seepage pressure is high.

Q. The safety of a hydraulic structure founded on a pervious foundation can be ensured by:

i. Provision sufficient length of its concrete floor.
ii. Providing sufficient depth of its concrete floor.
iii. Provision a downstream cutoff of some reasonable depth.

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!