A bridge culvert is to be constructed across a proposed lined canal. The afflux at this site for a contracted canal width can be computed by __________

a.

Unwin’s formula

b.

Broad-crested weir formula

c.

Orifice formula

d.

Molesworth formula

Posted under Irrigation Engineering

Answer: (d).Molesworth formula

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. A bridge culvert is to be constructed across a proposed lined canal. The afflux at this site for a contracted canal width can be computed by __________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. While going to the Tirupati Tirumala Devasthanam from Madras, highway road is found to be lowered at several places over which natural drainage flow during the rainy season. Such dips in the roads are called ___________________

Q. Which of the following formula is valid when the downstream depth is more than 80% of the upstream depth?

Q. What is the value of the coefficient of discharge for the wide bridge opening with floors?

Q. Calculate the economic length of one span for RCC Slab Bridge if the total height of abutment or pier from the bottom of its foundation to its top is 6m.

Q. In Broad Crested Weir formula, the discharge is dependent on ________________

Q. Calculate the longitudinal braking force (P) for four-lane bridges designed for class 70R loading.

Q. The greater is the heading up of water at the inlet end, the greater will be the flow velocity in case of culvert across some flat terrain.

Q. The foundations of bridges on erodible beds are taken down below the HFL by an amount equal to _____________

Q. The vertical component of the earthquake wave which produces adverse effects on the stability of a dam when is acting in ____________________

Q. The horizontal component of an earthquake wave producing instability in a dam is the one which acts __________________

Q. The vertical downward earthquake acceleration aᵥ = 0.1g acting on a gravity dam will ________________________

Q. A gravity dam is subjected to hydrodynamic pressure caused by __________

Q. In a concrete gravity dam with a vertical upstream face the stabilising force is provided by the ___________________

Q. What is the value of horizontal destabilizing force caused by the formation of waves in a storage reservoir having a fetch of 52 km due to high wind of 172 km/h?

Q. Calculate the value of free-board that should be provided for a reservoir having a wind velocity of 92 km/h and it extends up to 18 km upstream.

Q. The upward acceleration of dam due to seismic activity will ________________________

Q. What is the average value of acceleration that is sufficient for high dams in seismic zones?

Q. What is Von Karman’s formula for hydrodynamic force (Pₑ)?

Q. The factor of safety against overturning generally varies between ___________

Q. What is the maximum permissible tensile stress for high concrete gravity dam under worst conditions?

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!