Question

It is possible to construct steel dam only up to a height of ____________

a.

5 m

b.

10 m

c.

20 m

d.

50 m

Posted under Irrigation Engineering

Answer: (c).20 m

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. It is possible to construct steel dam only up to a height of ____________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The temporary structures that are built to enclose certain worksite is ______________

Q. Which of the following dam is suitable for narrow valleys?

Q. When sand and gravel foundation strata are available at a proposed dam site of moderate height, the dam may be of the type ________________

Q. According to the Hydraulic design, the dams are classified as _________

Q. A dam reservoir which is not provided with gate controls on its spillway and other sluices is called ________________

Q. A hydel power project has been envisaged to serve the water supply and irrigation needs of the area at its inception stage. The dam reservoir so constructed is known as __________________

Q. A dam reservoir catering to flood control, irrigation, and water supply basically designed for irrigation alone is a _______________-

Q. Which reservoir is also known as Mitigation reservoir?

Q. A reservoir having gates and valves installation at its spillway and at its sluice outlets ___________

Q. Which reservoir is helpful in permitting the pumps or the water treatment plants to work at a uniform rate?

Q. In which of the following reservoir the flood crest downstream can be better controlled and regulated properly?

Q. What are the types of flood control reservoirs?

Q. As the reservoir elevation increases, the outflow discharge increases.

Q. The maximum discharging capacity of a retarding reservoir should not be equal to the maximum safe carrying capacity of the channel downstream.

Q. What is the most important physical characteristic of a reservoir?

Q. In general practice adopted for capacity computations is to actually survey the site contours only at vertical distances of __________________

Q. The area-elevation curve when integrated will yield the capacity-elevation curve.

Q. Which of the following method does not give more than 3% error in the determination of the capacity of a reservoir?

Q. The surcharge storage in a dam reservoir is the volume of water stored ________________

Q. The useful storage in a dam reservoir is the volume of water stored __________________

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!