Question
a.
Accumulated flow v/s time
b.
Discharge v/s time
c.
(Cumulative Inflow – Cumulative Outflow) v/s time
d.
Mass outflow v/s time
Posted under Irrigation Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. A sequent peak algorithm is a plot between __________________
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. A flow duration curve is a curve plotted between ________________
View solution
Q. A steep slope of the flow duration curve indicates a stream with _________________
View solution
Q. The lowest portion of the capacity-elevation curve of a proposed irrigation reservoir draining 20 km² of catchment is represented by the following data:
i. The rate of silting for the catchment = 300 m³ / km² / year
ii. Life of the reservoir = 50 years
iii. Dead storage = 30
iv. The FSD of the canal at the head = 80 cm
v. The crop water requirement = 250 ha.m
vi. Dependable yield of the catchment = 0.29 m
Calculate the gross capacity of the reservoir.
View solution
Q. As the height of a proposed dam is increased, the cost per unit of storage initially increases and then decreases.
View solution
Q. The economical height of a dam is that height for which the ____________________
View solution
Q. If 20% of the reservoir capacity is earmarked for dead storage in a storage reservoir of 30 M.cum and the average annual silt deposition in the reservoir is 0.1 M cum, then the useful life of the reservoir will start reducing after ____________
View solution
Q. According to the Central Water Commission, the average annual evaporation loss is estimated to be _____________
View solution
Q. Windbreakers, Integrated operation of reservoirs and Use of underground storage are all methods of ______________________
View solution
Q. Which of the following is not used as WERs?
View solution
Q. Which of the following dam is situated in the seismologically inactive zone in Peninsular India?
View solution
Q. Which of the following measure does not prevent or reduce the intensity of the earthquake?
View solution
Q. Which of the following guideline is incorrect for the selection of a suitable site for a reservoir?
View solution
Q. The bar screens used to cover the dam outlets to prevent entry of debris, or ice into the spillway conduits are called __________________
View solution
Q. Projecting collars are provided on sides of a rectangular tunnel of length L made through an earthen dam to increase the seepage path. Their projection length (X) and numbers (N) are decided so as to provide increased seepage path equal to 2NX where 2NX should generally be ______________________
View solution
Q. The outlet provided in a dam body to release water for the downstream water demand is known as ______________________
View solution
Q. A 2 m diameter sluiceway at RL 300 m is provided through a concrete overflow dam section to release water to the downstream where tail water level is not more than 275 m. The discharge through this outlet when the water level in the reservoir is at FRL of 330 m is of the order of_________________
View solution
Q. A 4 m diameter tunnel has been constructed through an earthen dam with a bell mouth entry. The water levels on the U/s and D/s sides of the dam are at RL 226 m and 210 m respectively. What will be the discharge through this outlet?
View solution
Q. Which of the following entrance of the sluiceway is most superior?
View solution
Q. What is the correct Douma’s equation for rectangular tunnels or conduits?
View solution
Q. What is the value of head loss for the fully open gate and butterfly valves?
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!