The central core of the zoned embankment type earth dam ________________________

a.

checks the seepage

b.

prevents piping

c.

gives stability to the central impervious fill

d.

distribute the load over a large area

Posted under Irrigation Engineering

Answer: (a).checks the seepage

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The central core of the zoned embankment type earth dam ________________________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Which type of dam is suitable on shallow pervious foundations?

Q. What is the U.S.B.R recommended value for freeboard when the height of the dam is more than 60 m?

Q. What is the recommended formula for top width of a very low dam?

Q. What is the Terzaghi’s recommended value of U/s side slope for earth dam of height less than 15m of homogenous silty clay?

Q. If the height of the dam is 10 m, then the value of top width (A) according to Strange’s recommendations is _________________

Q. When the height of the dam is in between 7.5 to 15, the Strange’s recommended value for maximum freeboard of low earth dams is ______________

Q. Calculate the top width (A) of the earth dam of height 50 m.

Q. A phreatic line in seepage analysis is defined as the line on which pressure is _______________

Q. Provision of horizontal berms at suitable vertical intervals may be provided in the downstream face of an earthen dam in order to _________________

Q. During seepage through an earthen mass, the direction of seepage is ________________ to the equipotential lines.

Q. The upstream face of the earth dam is considered as _____________________

Q. The effects of capillary fringe are on the slightly safer side and are neglected.

Q. Which of the following line acts as a dividing line between dry (or moist) and submerged line?

Q. Stone pitching or riprap is generally provided to avoid _______________

Q. Provision of sufficient freeboard eliminates _______________

i. Over-topping failure
ii. Erosion of U/s face
iii. Erosion of D/s face
iv. Cracking due to frost action
v. Gully formation

Which of the following is/are correct?

Q. The collection and removal of water before it acquires high downward velocities is ensured by provision of ____________________

Q. In order to prevent the possibility of the cross-flow towards the earthen embankments, it is necessary to provide _____________________

Q. Sloughing is the process of _________________

Q. In foundation slide failure___________________________

Q. What is the most critical condition of slide of the U/s slope?