Question
a.
40%
b.
60%
c.
80%
d.
20%
Posted under Irrigation Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. As per estimate made by the Central Electricity Authority, the potential of the country is accessed at 84 GW at load factor value of _________________
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The first power station of India was installed at _________________
View solution
Q. What is the correct expansion of DAE?
View solution
Q. In India, the nuclear power generation is about ____________ of the total power generation.
View solution
Q. Which one is the first nuclear power plant in India?
View solution
Q. Convert the hydropower potential of 84 GW at 60% load factor into Trillion watts hour.
View solution
Q. The minimum power which a hydropower plant can generate throughout the year is called as ________________
View solution
Q. If the peak load for a power plant equals the plant capacity then the ratio of the capacity factor to load factor will be _________________
View solution
Q. If the peak load on a power plant having a capacity of 100 MW is 70 MW during a given week and the energy produced is 58, 80,000 kWh, the capacity factor for the plant for the week will be ___________________
View solution
Q. During a certain week a power plant turns out 84,00,000 kWh and the peak load during the week is 100,000 kW. What is the load factor during the week?
View solution
Q. A canal drop is 6 meters and discharges available through the turbine is 50 cumec. Find the electrical energy available.
View solution
Q. The ratio of maximum power utilised to the maximum power available is _____________
View solution
Q. The net amount of power which is continuously available from a plant without any break is known as _____________
View solution
Q. The value of power factor is generally _____________________
View solution
Q. To ensure maximum overall plant efficiency, the rated head should be equal to ______________
View solution
Q. The difference of head at the point of entry and exit of turbine is _______________
View solution
Q. The load on a hydel plant varies from a minimum of 10,000 kW to a maximum of 35,000 kW. Two turbo-generators of capacities 20,000 kW each have been installed. Calculate Plant factor.
View solution
Q. Calculate utilisation factor if the maximum power utilised is 40,000 kW and two turbo generators installed each of capacity 23,000 kW.
View solution
Q. If the peak load on a power plant having a capacity of 100 MW is 70 MW during a given week. Calculate the utilization factor.
View solution
Q. 400 cumecs of water are being released from dam storage to meet the downstream demand through the turbines of the connected hydro plant. The effective head of water acting on the turbines is 50 m. The efficiency of the hydro plant is 0.8. The electrical power generated from this plant is __________________
View solution
Q. What is the highest elevation of water level that can be maintained in the reservoir without any spillway discharge either with gated or non-gated spillway?
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!