Question

If two identical pumps each capable to deliver a discharge Q against a head H are connected ___________________________

a.

in parallel, the resulting discharge is 2Q against a head H

b.

in parallel, the resulting discharge is Q against a head of 2H

c.

in series, the resulting discharge is 2Q against a head H

d.

in series, the resulting discharge is Q against a head 2H

Answer: (a).in parallel, the resulting discharge is 2Q against a head H

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. If two identical pumps each capable to deliver a discharge Q against a head H are connected ___________________________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. If the specific speed in revolution per minute of a turbine is in between 60 to 300, the type of the turbine is ________________

Q. A draft tube is essentially required for impulse type turbines.

Q. Pick the correct choice of turbine required to generate 10,000 HP under a head of 81 m while working at a speed of 500 rpm.

Q. Consider the following statements.

i. Runoff river plants can be located on any river
ii. Runaway speed of a turbine is generally 180% of normal speed
iii. Underground power stations are suited to areas susceptible to landslides
iv. Higher the specific speed, higher will be the discharge and the head

Which of these statements are correct?

Q. The Pumps in series operation allow the head to increase and the pumps in parallel operation increase the flow rate.

Q. Forebay provides temporary storage before the water goes to the turbine. Following perform the function of forebay ____________________

Q. The surge tank serves which of the following purposes?

i. It allows the sediment to settle down
ii. It prevents debris from entering powerhouse
iii. It controls pressure variations in pipelines
iv. It regulates flow in the pipelines

Q. Identify the correct statement in regard to hydropower.

Q. To avoid the possible damage to the wicket gates and turbine runners _________________ is provided.

Q. In case of long penstocks, ___________________ is generally provided so as to absorb water hammer pressure.

Q. Sharp bends must be avoided in penstocks while designing components of the hydroelectric scheme.

Q. The retarding and accelerating heads are developed more promptly in ________________

Q. The correct sequence in the direction of the flow of water for installations in a hydropower plant is _______________________

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!