Question

The diameter of the sewer is 23cm. What should be the self cleansing velocity?

a.

10cm/Sec

b.

40cm/Sec

c.

100cm/Sec

d.

130cm/Sec

Answer: (c).100cm/Sec

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The diameter of the sewer is 23cm. What should be the self cleansing velocity?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. What should be the diameter of the sewer when the self cleansing velocity is 60cm/Sec?

Q. The maximum velocity at which no abrasion takes place is called _______

Q. The non scouring velocity is 260cm/Sec. The type of material of the sewer is __________

Q. The non scouring velocity required for cast iron sewer pipes is __________

Q. Which of the following is incorrect regarding circular sewer?

Q. A circular section of sewer gives _______ area for a given perimeter.

Q. What is the wetted perimeter of a circular section of sewer?

Q. The hydraulic mean depth of a circular section running full is __________

Q. The proportional depth of a circular sewer running partially half is __________

Q. The proportional perimeter of a circular sewer running partially half where K is the central angle subtended at a circular section of sewer is __________

Q. The diameter of the circular sewer is 0.2m. The desired depth of flow is __________

Q. The diameter of a circular sewer is 0.8m. The desired depth of flow is __________

Q. A circular sewer having 0.4m diameter is flowing with velocity 2m/Sec. If the gradient of sewer is 1 in 90. Find the value of Chezy’s coefficient?

Q. Which of the following sewer is called as an ovoid sewer?

Q. Egg shaped sewers are more suitable in a combined system during dry weather flow.

Q. Which of the following is incorrect regarding Egg shaped sewer?

Q. The upper portion of Egg shaped sewer is called as _____

Q. The Egg shaped sewer provides ____ velocity for low flows over the circular sewer of equal capacity.

Q. The lower portion of Egg shaped sewer is known as _____

Q. The height of standard section of Egg shaped sewer is ______ the new shaped section.

Recommended Subjects

Are you eager to expand your knowledge beyond Environmental Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!