Question

The total blow required for the second and third 15 cm of penetration in standard penetration test is taken as ____________

a.

Seating drive

b.

Penetration resistance

c.

Overburden pressure

d.

Dilatancy/submergence

Posted under Foundation Engineering

Answer: (a).Seating drive