a.
Q f = Q p + 2πRfs Df
b.
Q p = πR2(Q p + 2πRfs Df)
c.
Q p = 2πRfs Df
d.
All of the mentioned
Posted under Foundation Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. According to Terzaghi and Peck, the ultimate bearing capacity can be determined by which of the following expression?
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The well curb is designed for which of the following purpose?
View solution
Q. Which of the following can be assumed for design purpose of well curb?
View solution
Q. An effective well curb should withstand ___________
View solution
Q. The cutting edge should be provided with an angle of __________
View solution
Q. A sharp vertical edge for the well is provided at _________
View solution
Q. At a given depth, the skin friction of the well is equal to __________
View solution
Q. For loose sand, the value of skin friction is between ________
View solution
Q. Frictional resistance developed during the sinking the well depends on __________
View solution
Q. The skin friction developed in San Francisco Oakland Bay Bridge, was reduced by, which of the following methods?
View solution
Q. The bottom plug is designed in _________ shape.
View solution
Q. Laying of the well curb in river bed having water, is done by _________
View solution
Q. To avoid the setting of the cutting edge unevenly, ___________ can be introduced.
View solution
Q. The inside shuttering of the well curb is made up of _________
View solution
Q. Excavation of soil inside the well in river beds can be done by ________
View solution
Q. When the well is sunk deeper, the skin friction is decreased by which of the following method?
View solution
Q. Unequal dredging of well causes _________
View solution
Q. The radius of the well curb should be kept _________ larger than the outside radius of well steining.
View solution
Q. To counter act the tilts in the well during sinking operations, which of the following measures can be used?
View solution
Q. In which of the following methods, hydraulic jack is used to counter attack the tilt in the well?
View solution
Q. The method that is used to avoid the further increase in tilt is ___________
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Foundation Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!