Sewage System MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Sewage System, a fundamental topic in the field of Environmental Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Sewage System MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Sewage System mcq questions that explore various aspects of Sewage System problems. Each MCQ is crafted to challenge your understanding of Sewage System principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Environmental Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Sewage System MCQs are your pathway to success in mastering this essential Environmental Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Sewage System. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Sewage System knowledge to the test? Let's get started with our carefully curated MCQs!

Sewage System MCQs | Page 15 of 19

Discover more Topics under Environmental Engineering

Q141.
In order to reduce temperature stress ______________ joints are provided.
Discuss
Answer: (b).Expansion
Q142.
The expression for the temperature stress is given by __________
Discuss
Answer: (a).Eโ‚šฮฑt
Q143.
The type of backfill is saturated clay. What is its unit weight?
Discuss
Answer: (b).2080kg/m³
Q144.
Which of the following has the minimum unit weight?
Discuss
Answer: (a).Dry sand
Q145.
The type of soil is loose dry sand. What is the coefficient of cohesion of the soil?
Discuss
Answer: (d).0
Discuss
Answer: (b).Hard clay > Dense sand > Medium clay > Soft clay
Q147.
How many types of underground sewer are there on the basis of construction conditions?

a.

2

b.

3

c.

4

d.

5

Discuss
Answer: (b).3
Q148.
_______ condition exists when the sewer is laid at a depth between 9m to 12m.
Discuss
Answer: (c).Tunnel
Q149.
Negative projecting condition is a type of ______ condition.
Discuss
Answer: (d).Embankment
Q150.
Which of the following is not a sewer appurtenance?
Discuss
Answer: (c).Water tank