Pile Foundations MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Pile Foundations, a fundamental topic in the field of Foundation Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Pile Foundations MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Pile Foundations mcq questions that explore various aspects of Pile Foundations problems. Each MCQ is crafted to challenge your understanding of Pile Foundations principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Foundation Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Pile Foundations MCQs are your pathway to success in mastering this essential Foundation Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Pile Foundations. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Pile Foundations knowledge to the test? Let's get started with our carefully curated MCQs!

Pile Foundations MCQs | Page 7 of 9

Q61.
Pile groups in under-reamed pile foundation can be tested by means of _________
Discuss
Answer: (a).Free standing piles and Pile foundation
Q62.
The dimension of the bulb in an under-reamed pile can be checked by __________
Discuss
Answer: (b).G.I pipe assembly
Q63.
Cased cast-in-situ piles are suitable for _________ conditions.
Discuss
Answer: (c).All ground conditions
Q64.
Bored compaction piles are the modification of __________
Discuss
Answer: (c).Compaction piles
Discuss
Answer: (a).Raymond standard concrete pile and Raymond step-taper pile
Q66.
The Raymond standard pile is used primarily as a________
Discuss
Answer: (c).Friction pile
Discuss
Answer: (a).On-the-job-length flexibility and Internal inspection after being driven
Q68.
Who was the first to develop a method for placing cast-in-situ concrete piles?
Discuss
Answer: (c).Raymond
Q69.
Raymond concrete pile is reinforced with _________
Discuss
Answer: (a).Corrugated steel shell
Q70.
The type of cased piles used in soil, where the driving is very hard?
Discuss
Answer: (d).Swage pile
Page 7 of 9