Highway Drainage MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Highway Drainage, a fundamental topic in the field of Highway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Highway Drainage MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Highway Drainage mcq questions that explore various aspects of Highway Drainage problems. Each MCQ is crafted to challenge your understanding of Highway Drainage principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Highway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Highway Drainage MCQs are your pathway to success in mastering this essential Highway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Highway Drainage. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Highway Drainage knowledge to the test? Let's get started with our carefully curated MCQs!

Highway Drainage MCQs | Page 6 of 6

Discover more Topics under Highway Engineering

Q51.
In slab culverts RCC slab is placed over abudment of __________
Discuss
Answer: (a).Masonry
Q52.
The span of RCC slab is limited to __________
Discuss
Answer: (d).3.0 m
Q53.
What is the minimum diameter used in pipe culverts?
Discuss
Answer: (d).75 cm
Q54.
The GWT should be at a distance of _______ from ground level.
Discuss
Answer: (c).1.2 m
Q55.
The total interruption to traffic in a year should not exceed __________
Discuss
Answer: (d).15 days
Q56.
The clay seal may be provided if the seepage zone is at a depth of less than __________
Discuss
Answer: (d).0.6m to 0.9 m
Q57.
The capillary control can be controlled by how many methods?
Discuss
Answer: (b).Two
Q58.
To fulfill the adequate permeability the D15 of filter/D15 of foundation ratio should be greater than __________
Discuss
Answer: (a).5
Q59.
The D85 point size is given by __________
Discuss
Answer: (b).2Dp
Q60.
The loss of water from leaves present on embankment is called __________
Discuss
Answer: (b).Transpiration
Page 6 of 6