Highway Maintenance MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Highway Maintenance, a fundamental topic in the field of Highway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Highway Maintenance MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Highway Maintenance mcq questions that explore various aspects of Highway Maintenance problems. Each MCQ is crafted to challenge your understanding of Highway Maintenance principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Highway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Highway Maintenance MCQs are your pathway to success in mastering this essential Highway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Highway Maintenance. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Highway Maintenance knowledge to the test? Let's get started with our carefully curated MCQs!

Highway Maintenance MCQs | Page 9 of 11

Discover more Topics under Highway Engineering

Q81.
The pavement design in olden days was based on ___________
Discuss
Answer: (d).Proportion of weight or volume
Q82.
The thickness of the pavement in olden days was ___________
Discuss
Answer: (c).100 mm
Q83.
The cement production in India increased by the year.
Discuss
Answer: (c).1990
Q84.
The common types of failure in the cement slabs don’t include ___________
Discuss
Answer: (d).Erosion
Q85.
The design thickness of the CC slab of important highway with heavy traffic is?
Discuss
Answer: (d).300 mm
Q86.
The process of mud or soil being ejected out through the joints and edges of the CC pavements is called ___________
Discuss
Answer: (a).Mud pumping
Discuss
Answer: (b).Strong CC pavement
Q88.
The diameter of the holes in the mud jacking process is?
Discuss
Answer: (d).30 mm
Q89.
If a part of cement mortar gets detached from the surface, exposing the coarse aggregate which results in a rough surface, then it is called ___________
Discuss
Answer: (d).Scaling
Q90.
The factor not related to scaling of the concrete is ___________
Discuss
Answer: (c).Good quality of aggregate