House Drainage MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on House Drainage, a fundamental topic in the field of Waste Water Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our House Drainage MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of House Drainage mcq questions that explore various aspects of House Drainage problems. Each MCQ is crafted to challenge your understanding of House Drainage principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Waste Water Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our House Drainage MCQs are your pathway to success in mastering this essential Waste Water Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of House Drainage. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your House Drainage knowledge to the test? Let's get started with our carefully curated MCQs!

House Drainage MCQs | Page 1 of 9

Discover more Topics under Waste Water Engineering

Discuss
Answer: (b).Side of the building
Q2.
What is the angle between the drains and inspection manholes?
Discuss
Answer: (d).180หš
Q3.
The entire system should be ventilation free.
Discuss
Answer: (b).False
Q4.
_________ is the removal of excess surface water from the land to enhance crop growth.
Discuss
Answer: (b).Agricultural drainage
Q5.
Which of the following is not correct with respect to installing the drainage system in the waterlogged land?
Discuss
Answer: (a).Increase in water amount in soil
Q6.
Which of these is negative effect owing to the drier soil conditions?
Discuss
Answer: (d).Irrigation efficiency
Q7.
Which of these is a positive effect owing to the drier soil conditions?
Discuss
Answer: (d).Crop production
Discuss
Answer: (d).Removal of salts
Q9.
What is the time required for the depletion of oxygen in soil by waterlogging?
Discuss
Answer: (b).1-2 days
Q10.
What is the average land coverage of vertisols in Ethiopia?
Discuss
Answer: (c).13 million ha
Page 1 of 9