Question
a.
1.05-1.115
b.
4.4-7.3
c.
1.15-1.23
d.
1.23-1.56
Posted under Waste Water Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. What is the specific gravity of anion resin?
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. What is the surface area of the gel resin?
View solution
Q. The breakthrough curves for ion exchange column and adsorption column are dissimilar.
View solution
Q. The area ________ the breakthrough curve is equal to the maximum amount of ions removed by the column.
View solution
Q. Macroporous resins are required for demineralisation.
View solution
Q. What is the acceptable pressure drop at maximum flow rate?
View solution
Q. What is the minimum flow rate for SAC resins?
View solution
Q. What is the maximum silica content in treated water from a regeneration system?
View solution
Q. The production run should be _______ the regeneration process.
View solution
Q. What is the minimum flow rate for water treatment?
View solution
Q. What is the maximum operating flow for mixed bed units?
View solution
Q. Which is the year zeolite was used as ion exchange water softeners?
View solution
Q. _________resins can neutralize strong bases.
View solution
Q. Calculate the amount of resin required for the following information.
Cation Load: 10 ppm as CaCO₃
Capacity: 47 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs
View solution
Q. Calculate the amount of resin required for the following information.
Cation Load: 30 ppm as CaCO₃
Capacity: 47 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs
View solution
Q. Calculate the amount of resin required for the following information.
Cation Load: 80 ppm as CaCO₃
Capacity: 47 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs
View solution
Q. Calculate the amount of resin required for the following information.
Cation Load: 100 ppm as CaCO₃
Capacity: 57 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs
View solution
Q. Calculate the SAC resin required for the following data. It should be noted that prior to the SAC, a WAC system is present.
M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
EMA: 50 ppm as CaCO₃
Capacity: 57 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs
View solution
Q. The treatment system consists of a WAC, SAC which is followed by a WBA and SBA. Calculate the amount of WBA resin required for the following data.
M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
EMA: 25 ppm as CaCO₃
Capacity: 37 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs
View solution
Q. The treatment system includes a WAC, SAC, followed by a WBA and SBA. There is no degasser in this system. Calculate the amount of resin required for the following information.
M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
Silica: 45 ppm as CaCO₃
CO₂: 45 ppm as CaCO₃
Capacity: 37 Kg/m³
Correction factor: 0.9
Flow rate: 35 m³/hr
Operation hours: 10 hrs
View solution
Q. The treatment system includes a WAC, SAC, followed by a WBA and SBA. There is a degasser in this system. Calculate the amount of SBA resin required for the following data.
M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
Silica: 30 ppm as CaCO₃
CO₂: 45 ppm as CaCO₃
EMA: 100 ppm as CaCO₃
Capacity: 37 Kg/m³
Correction factor: 0.9
Flow rate: 35 m³/hr
Operation hours: 10 hrs
View solution