Question

The production run should be _______ the regeneration process.

a.

Shorter than

b.

Longer than

c.

Equal to

d.

Nearer to

Answer: (d).Nearer to

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The production run should be _______ the regeneration process.

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. What is the minimum flow rate for water treatment?

Q. What is the maximum operating flow for mixed bed units?

Q. Which is the year zeolite was used as ion exchange water softeners?

Q. _________resins can neutralize strong bases.

Q. Calculate the amount of resin required for the following information.

Cation Load: 10 ppm as CaCO₃
Capacity: 47 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs

Q. Calculate the amount of resin required for the following information.

Cation Load: 30 ppm as CaCO₃
Capacity: 47 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs

Q. Calculate the amount of resin required for the following information.

Cation Load: 80 ppm as CaCO₃
Capacity: 47 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs

Q. Calculate the amount of resin required for the following information.

Cation Load: 100 ppm as CaCO₃
Capacity: 57 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs

Q. Calculate the SAC resin required for the following data. It should be noted that prior to the SAC, a WAC system is present.

M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
EMA: 50 ppm as CaCO₃
Capacity: 57 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs

Q. The treatment system consists of a WAC, SAC which is followed by a WBA and SBA. Calculate the amount of WBA resin required for the following data.

M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
EMA: 25 ppm as CaCO₃
Capacity: 37 Kg/m³
Correction factor: 0.9
Flow rate: 135 m³/hr
Operation hours: 20 hrs

Q. The treatment system includes a WAC, SAC, followed by a WBA and SBA. There is no degasser in this system. Calculate the amount of resin required for the following information.

M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
Silica: 45 ppm as CaCO₃
CO₂: 45 ppm as CaCO₃
Capacity: 37 Kg/m³
Correction factor: 0.9
Flow rate: 35 m³/hr
Operation hours: 10 hrs

Q. The treatment system includes a WAC, SAC, followed by a WBA and SBA. There is a degasser in this system. Calculate the amount of SBA resin required for the following data.

M Alkalinity: 100 ppm as CaCO₃
P Alkalinity: 100 ppm as CaCO₃
Silica: 30 ppm as CaCO₃
CO₂: 45 ppm as CaCO₃
EMA: 100 ppm as CaCO₃
Capacity: 37 Kg/m³
Correction factor: 0.9
Flow rate: 35 m³/hr
Operation hours: 10 hrs

Q. ________ is the removal of calcium, magnesium and certain other metal cations in hard water.

Q. Soft water can foul plumbing.

Q. ________ form insoluble salts.

Q. Which of these methods does not remove hardness?

Q. Ion exchange resins are ______

Q. Ion exchange resins contain cation functional groups.

Q. _____ is added to hard water to make it softer.

Q. ________ is used in detergents to soften water.

Recommended Subjects

Are you eager to expand your knowledge beyond Waste Water Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!