Question

What is the order of arrangement of documents in the Report?

a.

Index, Report, Covering note

b.

Covering note, Index, Report, List of drawings, Appendices

c.

Index, Covering note, Report, List of drawings, Appendices

d.

Covering note, Index, Report, Appendices

Posted under Railway Engineering

Answer: (b).Covering note, Index, Report, List of drawings, Appendices

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. What is the order of arrangement of documents in the Report?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Which among the following is not included in the Appendices to the report?

Q. Which organization provides the maps for satellite imagery?

Q. Using satellite imagery multiple corridors can be marked. After this the corridor that satisfies all the surveying criteria can be chosen.

Q. For which areas satellite imagery is most useful in the initial stages of planning?

Q. The miniature details for the preliminary survey can be can be worked out with the help of contour maps, computer aids and ______

Q. What is the first step involved in Construction of a New line?

Q. Where should one refer to for the procedure of acquisition of land with the help of member state government?

Q. If we want to construct a single line railway track, the land available should be adequate for the construction of a double line.

Q. What does the slide slope provided for the embankment depends upon?

Q. Why is the Formation of an embankment preferred over formation in a cutting?

Q. What is the objective of doing mechanical compaction after laying each layer?

Q. Which curve is used to determine the economical lead of moving earth in the longitudinal direction?

Q. Why is the section where earthwork is to be done, divided into different zones?

Q. What are the factors on which the design of Bridges of railway are dependent?

Q. Which of the following is not a part of Plate laying or Track linking?

Q. In which method of Plate laying a temporary line is laid by side the of the proposed railway track?

Q. On what type of Terrain is the Tram line method most useful?

Q. In Side method what is used for carrying track material on site?

Q. For what type of banks, Borrow pits are provided only on one side of the track?

Q. Why are Service buildings required?

Recommended Subjects

Are you eager to expand your knowledge beyond Railway Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!