a.
a hill
b.
a depression
c.
a saddle or pass
d.
a river bed.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Closed contours of decreasing values towards their centre, represent
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Accuracy of 'fix' by two point problem, is
View solution
Q. A bearing of a line is also known as
View solution
Q. True meridians are generally preferred to magnetic meridians because
View solution
Q. Pick up the correct statement from the following :
View solution
Q. If θ is the slope of the ground and l is the measured distance, the correction is
View solution
Q. The sum of the interior angles of a geometrical figure laid on the surface of the earth differs from that of the corresponding plane figure only to the extent of one second for every
View solution
Q. The systematic errors which persist and have regular effects in the performance of a survey operation, are due to
View solution
Q. The best method of interpolation of contours, is by
View solution
Q. Pick up the correct specification of Ramsden eyepiece from the following :
View solution
Q. Pick up the correct statement from the following :
View solution
Q. The vertical angle between longitudinal axis of a freely suspended magnetic needle and a horizontal line at its pivot, is known
View solution
Q. A relatively fixed point of known elevation above datum, is called
View solution
Q. Cross hairs in surveying telescopes, are fitted
View solution
Q. An ideal transition curve is
View solution
Q. Pantagraph is used for
View solution
Q. If the angular measurements of a traverse are more precise than its linear measurements, balancing of the traverse, is done by
View solution
Q. The branch of surveying in which both horizontal and vertical positions of a point, are determined by making instrumental observations, is known
View solution
Q. In levelling operation
View solution
Q. Keeping the instrument height as 1.5 m, length of staff 4 m, the up gradient of the ground 1 in 10, the sight on the up slope must be less than
View solution
Q. True meridian of different places
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!