Question
a.
a vertical cliff
b.
a saddle
c.
a water shed line
d.
a hill top.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Contour lines of different elevations can unite to form one line, only in the case of
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The line of sight is kept as high above ground surface as possible to minimise the error in the observed angles due to
View solution
Q. Number of subdivisions per metre length of a levelling staff is
View solution
Q. A lemniscate curve between the tangents will be transitional throughout if the polar deflection angle of its apex, is
View solution
Q. Pick up the correct statement from the following :
View solution
Q. Prolongation of chain line across an obstruction in chain surveying, is done by
View solution
Q. Check lines (or proof lines) in Chain Surveying, are essentially required
View solution
Q. While measuring the distance between two points along upgrade with the help of a 20 m chain, the forward end of the chain is shifted forward through a distance
View solution
Q. Subtense tacheometry is generally preferred to if ground is
View solution
Q. For high sensivity of the bubble tube
View solution
Q. Short offsets are measured with
View solution
Q. The operation of revolving a plane table about its vertical axis so that all lines on the sheet become parallel to corresponding lines on the ground, is known
View solution
Q. If a linear traverse follows a sharp curve round a large lake where it is difficult to have long legs, the accuracy of the traverse may be improved by
View solution
Q. Perpendicular offset from a tangent to the junction of a transition curve and circular curve is equal to
View solution
Q. Rankine's deflection angle in minutes is obtained by multiplying the length of the chord by
View solution
Q. The approximate formula for radial or perpendicular offsets from the tangent, is
View solution
Q. The line of collimation method of reduction of levels, does not provide a check on
View solution
Q. The chaining on sloping ground is
View solution
Q. Profile levelling is usually done for determining
View solution
Q. For indirect ranging, number of ranging rods required, is
View solution
Q. Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units, is
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!