In a grit chamber of a sewage treatment plant,

a.

flow velocity 0.15 m to 0.3 m/sec is kept

b.

depth of 0.9 m to 1.20 m is kept

c.

one minute of detention period is kept

d.

all the above.

Posted under Civil Engineering

Answer: (d).all the above.

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. In a grit chamber of a sewage treatment plant,

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Pick up the incorrect statement from the following for allowing workers to enter sewers

Q. The normal values of over flow rates for sedimentation tanks using coagulent, ranges between

Q. 1000 kg of sewage contains

Q. The intensity of rain is expressed in

Q. If a 2% solution of sewage sample is incubated for 5 days at 20°C and the dissolved oxygen depletion was found to be 8 mg/l. The BOD of the sewage is

Q. The most efficient cross section of sewers in a separate sewerage system is

Q. The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be

Q. The sewage treatment units in which anaerobic decomposition of organic matter is used, are called

Q. In a sludge tank, the gas mainly produced, is

Q. The grit and silt of the grit chambers, may not be used for

Q. Pick up the incorrect size of stone ware sewers

Q. The most efficient cross-section of sewers in a combined sewerage system is

Q. The quantity of liquid waste which flows in sewers during the period of rainfall, is known

Q. Which of the following pumps in used to pump sewage solids with liquid sewage without clogging the pump is

Q. The temperature affects the

Q. For a continuous flow type of sedimentation tanks

Q. The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope

Q. In normal conditions, the period for sludge digestion, is

Q. If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains

Q. Setting out the alignments of sewers may start from

Recommended Subjects

Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!