Question
a.
Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil
b.
The lead is calculated for each block of the excavated area
c.
The unit of lead is 50 m for a distance upto 500 m
d.
The unit of lead is 1 km where the lead exceeds 2 km.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Pick up the incorrect statement from the following:
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Pick up the correct statement regarding the centre line method of estimating a building
View solution
Q. The brick work is not measured in cu m in case of
View solution
Q. The rate of an item of work depends on
View solution
Q. Pick up the correct statement from the following:
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The expected out turn of half brick partition wall per mason per day is
View solution
Q. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
View solution
Q. The floor area includes the area of the balcony up to
View solution
Q. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
View solution
Q. For the construction of buildings, the subheads of the estimate are
View solution
Q. The measurement is made for stone work in square metre in case of
View solution
Q. The 'centre line method' is specially adopted for estimating
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!