Question
a.
Specifications of works
b.
Specifications of materials
c.
Proportion of mortar
d.
All the above.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. The rate of an item of work depends on
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The brick work is not measured in cu m in case of
View solution
Q. Pick up the correct statement regarding the centre line method of estimating a building
View solution
Q. Pick up the incorrect statement from the following:
View solution
Q. The trap which is provided to disconnect the house drain from the street sewer is called
View solution
Q. Carpet area does not include the area of
View solution
Q. Pick up the incorrect statement from the following:
View solution
Q. Berms are provided in canals if these are
View solution
Q. The measurement is made in square metre in case of
View solution
Q. Pick up the incorrect statement from the following:
View solution
Q. The rate of payment is made for 100 cu m (per % cu m) in case of
View solution
Q. The following item of earth work is not measured separately.
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
View solution
Q. Pick up the correct statement from the following:
View solution
Q. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
View solution
Q. The weight of an item is measured correct to nearest
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
View solution
Q. The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is
View solution
Q. Pick up the correct statement from the following:
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!