Question
a.
inclined borings are made for taking samples under existing structures
b.
inclined borings are occasionally used instead of vertical holes.
c.
the spacing of inclined borings is kept such that one bore hole is vertically above the bottom of an adjacent bore hole.
d.
all the above.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Pick up the correct statement from the following :
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Pick up the commonly adopted geophysical method in civil engineering from the following :
View solution
Q. To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act
View solution
Q. The 9 cm x 9 cm side of a brick as seen in the wall face, is generally known as
View solution
Q. The taper of precast concrete pile should not be more than
View solution
Q. The under surface of an arch, is called
View solution
Q. The raft slab is projected beyond the outer walls of the structure by
View solution
Q. The process of making the back ground rough, before plastering, is
View solution
Q. Black cotton soil is unsuitable for foundations because its
View solution
Q. Dutch bond is a modification of
View solution
Q. The 19 cm x 9 cm side of a brick as seen in the wall face, is generally known as
View solution
Q. The depth of the ground water table may be ascertained by
View solution
Q. Pick up the correct statement from the following :
View solution
Q. Pick up the correct statement from the following :
View solution
Q. The strength of brick masonry in 1:6 cement mortar, is
View solution
Q. The dimensions of a half queen closer, are
View solution
Q. In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to
View solution
Q. For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than
View solution
Q. For different layers of cement concrete floor. Pick up the incorrect statement from the following :
View solution
Q. The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to
View solution
Q. The compaction of concrete in the drilled pile hole is done by compressed air in the case of
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!