Question

For different layers of cement concrete floor. Pick up the incorrect statement from the following :

a.

The lowest layer consists of consolidated ground

b.

A 10 cm thick clean sand is laid on consolidated ground

c.

A 10 cm lime concrete (1 : 4 : 8) is laid on clean sand

d.

A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer.

Posted under Civil Engineering

Answer: (d).A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer.

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. For different layers of cement concrete floor. Pick up the incorrect statement from the following :

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to

Q. The compaction of concrete in the drilled pile hole is done by compressed air in the case of

Q. The opening provided in sloping roof with its top parallel to the roof surface, is called

Q. The type of ashlar masonry in which stones are finely chisel dressed and thickness of joints does not exceed 3 mm, is

Q. The lower half portion between crown and skew back of the arch, is called

Q. Cast iron piles

Q. The depth of an arch is the distance between

Q. Expansion joints in masonry walls are provided if length exceeds

Q. The platform at the end of a series of steps, is known as

Q. Raft foundation are generally preferred to when the area required for individual footing, is more than

Q. The columns of multi-storeyed buildings are designed to withstand the forces due to

Q. The black cotton soil

Q. Pick up the incorrect statement from the following:

Q. Exposed portions of vertical surface at right angles to the door or window frame, are known as

Q. To obtain good bonding in brick masonry

Q. Rotary drilling

Q. In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used

Q. In grillage foundations a minimum 15 cm cover is provided on

Q. The skirting/dado in a bath roof should be upto

Q. The maximum bearing capacity of soil is that of

Recommended Subjects

Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!