Question

Pick up the correct statement from the following :

a.

Yield of a drainage basin is the run off at any time

b.

Yield of a drainage basin is the run off over long periods

c.

Yield of a drainage basin is expressed as surface run off per year

d.

Run off is expressed as total volume per day

Posted under Civil Engineering

Answer: (b).Yield of a drainage basin is the run off over long periods

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Pick up the correct statement from the following :

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Pick up the correct statement from the following :

Q. Knowledge of hydrology is necessary for civil engineers for

Q. Water is useful for

Q. Humidity refers to

Q. If the dew point is greater than 0°C

Q. A volume of air at constant barometric pressure may be brought to dew point by

Q. Pressure exerted by fully saturated air, is known

Q. Pick up the correct statement from the following :

Q. The equation P - Q = Te φindex for determining the infiltration capacity, was suggested by

Q. If the slope of a line for infiltration capacity curve is 1/1.737 , the value of constant k in Horton's equation of infiltration capacity curve, is

Q. Pick up the correct statement from the following :

Q. A soil strata may consist of

Q. Pick up the correct statement from the following :

Q. The specifications of most commonly used standard gauges in India, are

Q. Precipitation caused due to striking of air masses with a topographical feature, is called

Q. Precipitation caused due to upward movement of warmer air as compared to surrounding air, is called

Q. Pick up correct statement from the following :

Q. Relative humidity is the ratio of actual vapour pressure to the saturation vapour pressure

Q. Dicken's formula for high flood estimate, is useful only for the catchments in

Q. In estimating the rate of evaporation from the reservoir surface, a pan 1.5 metres in diameter, was filled upto 8.0 cm. During a specified period of time, the rainfall recorded was 5 cm. 3 cm of water was removed from the pan to keep the depth of water. At the end of the time, the depth was 9 cm. If the pan coefficient is 0.6, the evaporation loss is

Recommended Subjects

Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!