Question
a.
Holes are drilled by pneumatically operated rock drills
b.
One drill is required for each 4 to 5 m² force area
c.
The diameter of the bore hole at the deepest point should be 6 mm more than the diameter of the cartridge
d.
All of the above.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Pick up the correct statement regarding drilling a tunnel from the following:
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. For tunnels exceeding 300 m in length, the grade should be provided below
View solution
Q. The method of draining in the tunnels, is generally known as
View solution
Q. Pick up the correct statement from the following during tunnel excavation,
View solution
Q. To attain the required shape of the tunnel section, we use :
View solution
Q. Pick up the mechanical ventilation method used for tunnels from the following:
View solution
Q. Which one of the following methods of tunnelling does not require the use of time bearing :
View solution
Q. For highways, tunnelling is preferred to if the open cut exceeds :
View solution
Q. The following operations are required for tunnelling in rocky terrain :
1. Removing the foul gases
2. Marking the tunnel profile
3. Setting up and drilling
4. Checking misfire
5. Mucking
The correct sequence is :
View solution
Q. The advantages of providing a pair of tunnels as compared to only one large highway tunnel is :
View solution
Q. Which one of the following statements is not correct in respect of setting of an inclined tunnel:
View solution
Q. Forepoling method is generally adopted for tunnelling in :
View solution
Q. Concrete lining is provided concurrently with the driving operation in case of
View solution
Q. The concentration of the dust particles of the size 0.5 to 5 microns adjacent to the working face should not be more than
View solution
Q. Which one of the following statements is not correct with regard to heading and hench-ing method of tunnelling.
View solution
Q. The most commonly adopted pattern of cut holes is :
View solution
Q. Which one of the following linings is suitable for shield driven tunnels particularly in the subaqueous regions :
View solution
Q. In case of railways,
View solution
Q. The following tunnels were constructed in different countries for different purposes :
1. Emperor Claudius built the first Roman tunnel
2. The first highway tunnel was constructed in Hungary
3. The first underground railway tunnel was constructed in Great Britain
4. The first navigational tunnel was constructed in France.
The correct chronological development of these tunnels is:
View solution
Q. The following operations are generally employed for tunnelling in hard rock.
1. Removing ground water.
2. Loading holes and firing the explosive
3. Setting up and drilling
4. Grouting and lining
5. Removing muck
6. Ventilation and removing explosion dust
The correct sequence is :
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!