Q. A canal which when fully developed yields enough revenue to cover up its running cost is known as _____________
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Which type of canal does not need cross drainage structures?
View solution
Q. What is the name given to the junction of two streams?
View solution
Q. On flatlands what type of canal alignment is used?
View solution
Q. A canal aligned on the watershed saves the cost of constructed cross drainage works.
View solution
Q. Which type of canal is most useful in hilly areas?
View solution
Q. Contour canal can irrigate only on one side of the canal.
View solution
Q. What type of canal necessitates construction of cross drainage works more than any other types?
View solution
Q. Which type of canal is the farmer’s responsibility?
View solution
Q. Which type of canal need syphons?
View solution
Q. If a looping is present in the ridge line they how can that area be irrigated with?
View solution
Q. A curve in channel results in _____________
View solution
Q. If the discharging capacity of the channel is less than 0.5 cumecs then, the minimum recommended value for curve radius is _________
View solution
Q. The Gross Command Area (G.C.A) represents the geographical area of the Doab.
View solution
Q. What is the Annual Intensity of irrigation (AII)?
View solution
Q. What is Gross Cropped Area?
View solution
Q. The ratio of the actual operating period of a distributary to the crop period is called as ____________
View solution
Q. The number of hectares irrigable per cumec of the canal capacity at its head is known as ____________
View solution
Q. The cropped area in Rabi season is usually increased.
View solution
Q. The Gross Command Area for a distributary is 8000 hectares 80% of which is culturable irrigable. The intensity of irrigation for Rabi season is 50% and the average duty at the head of the distributary is 2000 hectares/cumec. Determine the discharge required at the head of the distributary.
View solution
Q. The CCA of a water course is 1500 hectares. The intensity of sugarcane and wheat crops is 20% and 40% respectively. The duties for the crops at the head of the watercourse are 730 hectares/cumec and 1600 hectares/cumec respectively. Calculate the design discharge at the outlet assuming a time factor equal to 0.8.
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!