Question

A canal which when fully developed yields enough revenue to cover up its running cost is known as _____________

a.

protective canal

b.

productive canal

c.

permanent canal

d.

inundation canal

Answer: (b).productive canal

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. A canal which when fully developed yields enough revenue to cover up its running cost is known as _____________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Which type of canal does not need cross drainage structures?

Q. What is the name given to the junction of two streams?

Q. On flatlands what type of canal alignment is used?

Q. A canal aligned on the watershed saves the cost of constructed cross drainage works.

Q. Which type of canal is most useful in hilly areas?

Q. Contour canal can irrigate only on one side of the canal.

Q. What type of canal necessitates construction of cross drainage works more than any other types?

Q. Which type of canal is the farmer’s responsibility?

Q. Which type of canal need syphons?

Q. If a looping is present in the ridge line they how can that area be irrigated with?

Q. A curve in channel results in _____________

Q. If the discharging capacity of the channel is less than 0.5 cumecs then, the minimum recommended value for curve radius is _________

Q. The Gross Command Area (G.C.A) represents the geographical area of the Doab.

Q. What is the Annual Intensity of irrigation (AII)?

Q. What is Gross Cropped Area?

Q. The ratio of the actual operating period of a distributary to the crop period is called as ____________

Q. The number of hectares irrigable per cumec of the canal capacity at its head is known as ____________

Q. The cropped area in Rabi season is usually increased.

Q. The Gross Command Area for a distributary is 8000 hectares 80% of which is culturable irrigable. The intensity of irrigation for Rabi season is 50% and the average duty at the head of the distributary is 2000 hectares/cumec. Determine the discharge required at the head of the distributary.

Q. The CCA of a water course is 1500 hectares. The intensity of sugarcane and wheat crops is 20% and 40% respectively. The duties for the crops at the head of the watercourse are 730 hectares/cumec and 1600 hectares/cumec respectively. Calculate the design discharge at the outlet assuming a time factor equal to 0.8.