a.
Committee on Revenue Collection on Irrigation Water
b.
Committee on Pricing of Irrigation Water
c.
Committee on Recovery of Charges
d.
Committee on Finding the Irrigation Structures
Posted under Irrigation Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. What is the name of the committee appointed by the government on 23-10-1991?
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Which state has completely avoided the irrigation revenue rates?
View solution
Q. On what factors does the economic water rate depend?
View solution
Q. Canal drop or canal fall is needed construction in the canal bed.
View solution
Q. On what term does the construction of a fall in the case of the main canal depend?
View solution
Q. On what factor in case of branch canals, the construction site for a fall depends?
View solution
Q. How many types of falls are present?
View solution
Q. What number of major defects does the ogee fall have?
View solution
Q. In which fall the depth discharge relationship is unaffected?
View solution
Q. Which type of fall is suitable for 60 cumecs discharge and 1.5 m drop?
View solution
Q. What is the reason for the construction of baffle wall in baffle fall?
View solution
Q. Which type of fall is not adopted in India?
View solution
Q. Canal drops are provided to _______________
View solution
Q. For a canal that irrigates the area directly the fall should be provided at a location FSL outstrips the G.L before the bed of the canal comes into the filling.
View solution
Q. In case of branch canals and distributary channels, the falls are located with consideration to _________________
View solution
Q. By providing a natural drop in one drop _______________________
View solution
Q. A canal fall is provided when the available natural slope is flatter than the designed bed slope of the channel.
View solution
Q. Consider the following statements.
I. Possibility of combining some other structure with a fall eg. regulator, road bridge etc.
II. Cutting and filling are required below and above the fall should not be necessarily equal.
III. The command should not be reduced due to the lowering of F.S.L and the fall may be located below the outlets.
Which of the following statement is correct for site selection of a fall?
View solution
Q. ______________ fall is adopted for smaller discharges and larger drops.
View solution
Q. Consider the following statements.
I. Syphon falls are commonly used where high levelled small drains do out-fall into a low levelled bigger drain.
II. The D/s well is necessary in case of falls greater than 1.8 m and for discharges greater than 0.29 cumecs.
III. The design discharge is determined based on the fact that V-notch is used.
Which of the following statement is correct?
View solution
Q. Calculate the velocity over the notch (V₁) and the velocity through the pipe (V₃) if the full supply discharge is 2 cumecs. The area of flow over the trapezoidal notch is 0.58 m². Assume the value of diameter of the pipe used as 1 m.
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!