Question

Which of the following dam is not an example of High head scheme?

a.

Bhakra dam in Punjab

b.

Rihand dam In UP

c.

Hoover Dam in the USA

d.

Sarda canal

Posted under Irrigation Engineering

Answer: (d).Sarda canal

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Which of the following dam is not an example of High head scheme?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Pondage in a hydropower station is _________________________________

Q. In a low head scheme, a weir or barrage is constructed to raise the water level.

Q. Which of the following plant uses a reversible turbine that can work at relatively high efficiencies and helps in reducing the cost of such a plant?

Q. As per estimate made by the Central Electricity Authority, the potential of the country is accessed at 84 GW at load factor value of _________________

Q. The first power station of India was installed at _________________

Q. What is the correct expansion of DAE?

Q. In India, the nuclear power generation is about ____________ of the total power generation.

Q. Which one is the first nuclear power plant in India?

Q. Convert the hydropower potential of 84 GW at 60% load factor into Trillion watts hour.

Q. The minimum power which a hydropower plant can generate throughout the year is called as ________________

Q. If the peak load for a power plant equals the plant capacity then the ratio of the capacity factor to load factor will be _________________

Q. If the peak load on a power plant having a capacity of 100 MW is 70 MW during a given week and the energy produced is 58, 80,000 kWh, the capacity factor for the plant for the week will be ___________________

Q. During a certain week a power plant turns out 84,00,000 kWh and the peak load during the week is 100,000 kW. What is the load factor during the week?

Q. A canal drop is 6 meters and discharges available through the turbine is 50 cumec. Find the electrical energy available.

Q. The ratio of maximum power utilised to the maximum power available is _____________

Q. The net amount of power which is continuously available from a plant without any break is known as _____________

Q. The value of power factor is generally _____________________

Q. To ensure maximum overall plant efficiency, the rated head should be equal to ______________

Q. The difference of head at the point of entry and exit of turbine is _______________

Q. The load on a hydel plant varies from a minimum of 10,000 kW to a maximum of 35,000 kW. Two turbo-generators of capacities 20,000 kW each have been installed. Calculate Plant factor.

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!