Question
a.
should be greater than
b.
should be less than
c.
should be equal to
d.
does not depend on
Posted under Geotechnical Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. The suction head ____________ capillary head in vacuum method of dewatering.
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. In vacuum method, the top of bore hole is sealed by __________
View solution
Q. In vacuum method, the ground surface is subjected to unbalanced atmospheric pressure.
View solution
Q. The fine grained cohesive soils can be stabilised by ______
View solution
Q. The dewatering of soil by electro-osmosis was developed by ______
View solution
Q. The electro-osmosis method of dewatering increases ______
View solution
Q. The velocity of flow towards cathode in electro-osmosis method is given by _________
View solution
Q. In vacuum method, the vacuum drawn on the well-point stiffened the sub-soil to carry out excavations.
View solution
Q. In electro-osmosis method, when direct current is applied to the electrodes, the soil water will _________
View solution
Q. The removal of excess of water from the saturated soil mass is called __________
View solution
Q. Which one of the following method can be used to lower water table, using gravity flow?
View solution
Q. The diameter of the perforated pipe used in well point system is __________
View solution
Q. The ground water table may be lowered by which of the following methods?
View solution
Q. What is the minimum depth of water that can be brought to the surface in well point system?
View solution
Q. For dewatering more than 6m below the water table, which of the following method is used?
View solution
Q. A advantage of using jetting of water in well point system is ___________
View solution
Q. In well point system, ___________should be made essential for proper working of the system.
View solution
Q. The pump which is used for suction of water in the well point system is ___________
View solution
Q. The seepage analysis is done on the assumption of ____________
View solution
Q. For unconfined flow, which of the following discharge slot is used?
View solution
Q. Fine grained cohesive soil can be drained or stabilized by __________
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Geotechnical Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!