Sewage System MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Sewage System, a fundamental topic in the field of Environmental Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Sewage System MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Sewage System mcq questions that explore various aspects of Sewage System problems. Each MCQ is crafted to challenge your understanding of Sewage System principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Environmental Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Sewage System MCQs are your pathway to success in mastering this essential Environmental Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Sewage System. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Sewage System knowledge to the test? Let's get started with our carefully curated MCQs!

Sewage System MCQs | Page 4 of 19

Discover more Topics under Environmental Engineering

Q31.
_______ is the additional flow occurring during rainy season.
Discuss
Answer: (d).Storm water flow
Q32.
Which flow is also called as sanitary sewage?
Discuss
Answer: (a).Dry weather flow
Q33.
Which of the following factor does not effect the dry weather flow?
Discuss
Answer: (b).Temperature conditions
Q34.
The quantity of waste water is assumed to be ___________ % of the quantity of water supply.
Discuss
Answer: (d).80
Q35.
The sewer should be designed for a minimum of ______ litres of waste water per capita per day.
Discuss
Answer: (c).150
Q36.
The size of the town is 15,000. What is the density of population per hectare?
Discuss
Answer: (d).200
Q37.
The design period of main and branch sewer is ___________
Discuss
Answer: (c).30years
Q38.
___________ is the process in which ground water unfiltrate into the sewers.
Discuss
Answer: (b).Infiltration
Q39.
________ is the process which indicates the flow of waste water from the sewer into the ground.
Discuss
Answer: (a).Exfiltration
Q40.
Infiltration of water does not depend on ___________
Discuss
Answer: (c).Quality of water