Sewage System MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Sewage System, a fundamental topic in the field of Environmental Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Sewage System MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Sewage System mcq questions that explore various aspects of Sewage System problems. Each MCQ is crafted to challenge your understanding of Sewage System principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Environmental Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Sewage System MCQs are your pathway to success in mastering this essential Environmental Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Sewage System. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Sewage System knowledge to the test? Let's get started with our carefully curated MCQs!

Sewage System MCQs | Page 5 of 19

Q41.
The design period of main and branch sewer is ___________
Discuss
Answer: (c).30years
Q42.
___________ is the process in which ground water unfiltrate into the sewers.
Discuss
Answer: (b).Infiltration
Q43.
________ is the process which indicates the flow of waste water from the sewer into the ground.
Discuss
Answer: (a).Exfiltration
Q44.
Infiltration of water does not depend on ___________
Discuss
Answer: (c).Quality of water
Q45.
The rate of infiltration lies in the range of ______ m³/hectare/day.
Discuss
Answer: (a).0.20-0.28
Q46.
The relation between the maximum and average rate of flow is defined by ___________
Discuss
Answer: (a).QMAX = (1 + 14/(4 + P⁰·⁵)) * QAVG
Q47.
In India, the maximum sewage flow occurs normally in which month?
Discuss
Answer: (a).July
Q48.
The minimum sewage flow occurs normally in which month in India?
Discuss
Answer: (b).January
Discuss
Answer: (d).Peak flow / Average flow
Q50.
Which of the following has a maximum peaking factor?
Discuss
Answer: (a).Domestic sewer
Page 5 of 19