Canal Irrigation System and Canal Falls MCQs
Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Canal Irrigation System and Canal Falls, a fundamental topic in the field of Irrigation Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Canal Irrigation System and Canal Falls MCQs are designed to help you grasp the core concepts and excel in solving problems.
In this section, you'll find a wide range of Canal Irrigation System and Canal Falls mcq questions that explore various aspects of Canal Irrigation System and Canal Falls problems. Each MCQ is crafted to challenge your understanding of Canal Irrigation System and Canal Falls principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Irrigation Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Canal Irrigation System and Canal Falls MCQs are your pathway to success in mastering this essential Irrigation Engineering topic.
Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Canal Irrigation System and Canal Falls. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!
So, are you ready to put your Canal Irrigation System and Canal Falls knowledge to the test? Let's get started with our carefully curated MCQs!
Canal Irrigation System and Canal Falls MCQs | Page 14 of 16
Discover more Topics under Irrigation Engineering
I. Possibility of combining some other structure with a fall eg. regulator, road bridge etc.
II. Cutting and filling are required below and above the fall should not be necessarily equal.
III. The command should not be reduced due to the lowering of F.S.L and the fall may be located below the outlets.
Which of the following statement is correct for site selection of a fall?
I. Syphon falls are commonly used where high levelled small drains do out-fall into a low levelled bigger drain.
II. The D/s well is necessary in case of falls greater than 1.8 m and for discharges greater than 0.29 cumecs.
III. The design discharge is determined based on the fact that V-notch is used.
Which of the following statement is correct?