Industrial Engineering and Production Management MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Industrial Engineering and Production Management, a fundamental topic in the field of Mechanical Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Industrial Engineering and Production Management MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Industrial Engineering and Production Management mcq questions that explore various aspects of Industrial Engineering and Production Management problems. Each MCQ is crafted to challenge your understanding of Industrial Engineering and Production Management principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Mechanical Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Industrial Engineering and Production Management MCQs are your pathway to success in mastering this essential Mechanical Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Industrial Engineering and Production Management. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Industrial Engineering and Production Management knowledge to the test? Let's get started with our carefully curated MCQs!

Industrial Engineering and Production Management MCQs | Page 4 of 17

Discover more Topics under Mechanical Engineering

Q31.
A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called
Discuss
Answer: (a).hoist
Q32.
A diagram showing the path followed by men and materials while performing a task is known as
Discuss
Answer: (d).flow diagram
Q33.
Simplex method is the method used for
Discuss
Answer: (c).linear programming
Discuss
Answer: (c).is concerned with the starting of processes
Q35.
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
Discuss
Answer: (a).Halsey plan
Discuss
Answer: (a).relative values of a job
Q37.
The routing function in a production system design is concerned with
Discuss
Answer: (c).machine utilisation
Q38.
The determination of standard time in a complex job system is best done through
Discuss
Answer: (d).analysis of standard data system
Discuss
Answer: (b).(Crash Cost - Normal cost)/ (Normal time - Crash time)
Q40.
If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be
Discuss
Answer: (d).TR + [(S - T)/S] × R