Project Survey MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Project Survey, a fundamental topic in the field of Surveying. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Project Survey MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Project Survey mcq questions that explore various aspects of Project Survey problems. Each MCQ is crafted to challenge your understanding of Project Survey principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Surveying tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Project Survey MCQs are your pathway to success in mastering this essential Surveying topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Project Survey. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Project Survey knowledge to the test? Let's get started with our carefully curated MCQs!

Project Survey MCQs | Page 4 of 11

Q31.
Which of the following can be used as a diversion structure?
Discuss
Answer: (b).Barrage
Q32.
Which of the following can be indicated as the classification of the surface irrigation method?
Discuss
Answer: (c).Flooding method
Q33.
A small basin is adopted in case of ____________
Discuss
Answer: (a).Sandy soil
Q34.
Flat land can adopt large basins.
Discuss
Answer: (a).True
Q35.
Which of the following can be identified as the objective of water supply scheme?
Discuss
Answer: (c).Safe water supply
Q36.
Which of the following indicates the component of a water supply scheme?
Discuss
Answer: (d).Intake of the water
Q37.
Surface water can act as a source of water in water supply scheme.
Discuss
Answer: (a).True
Q38.
While considering the design period, which must be given more priority?
Discuss
Answer: (b).Population
Q39.
The design period of storage reservoir can be given as _________
Discuss
Answer: (a).50 yr
Q40.
Which of the following can be designated as an intake structure?
Discuss
Answer: (d).Reservoir
Page 4 of 11